Friday, March 27, 2009

Now we have a kitchen

A lot of progress in the last couple of days. Brian is quickly getting cabinets installed. First the kitchen:



Like I said in the last post, most of the cabinet doors are maple. We're looking for a modern craftsman look, so we chose flat panel doors with a full overlay so you can't see a whole lot of the face frames, and stainless steel pulls. The doors on the oven cabinet are maple, but it is highlighted with a cherry frame and cabinet box. We'll have something similar on the other side of the kitchen above the cooktop and oven:



The picture turned out a bit too dark, I'll upload another after the counters go in. Here's one more view of the kitchen:



Scott is making good progress on the stairs. The columns on the first floor are all wrapped in cherry, all of the skirt boards are in, and he started on the tread caps: